EVENTS    |    ABOUT US    |    CONTACT    |    LIBRARY      Find Us On Facebook social twitter Instagram icon youtube Kawartha Conservation On LinkedIn 

Study 4 - Omemee East Tributary

document
Uploaded:
Friday, 11 November 2016

This draft flood plain mapping study is for the Omemee East Tributary. This watercourse drains mainly rural lands east of Omemee and south of Highway #7 and outlets to the Omemee Mill Pond after crossing Queen Street South. Previous reports have identified flood elevations for the Mill Pond and this study will use this information as a starting water level. Further mapping based on the hydrology and hydraulics of this channel will be completed within the village’s future urban boundary.

The following documents can be accessed using the drop menu below: Draft Report and Map 1.

Filesize: 16.83 MB

Filesize: 4.63 MB

This draft material has been peer reviewed to ensure it meets industry standards, and has been approved by our Board of Directors.

The full draft study appendix can be provided upon request- please contact Galen Yerex GYerex@KawarthaConservation.com.

Hard copies can also be produced on request for a fee to cover printing and staff time. Digital modelling files are also available upon request and are subject to a data sharing agreement and an administrative fee.